Coalfields Pest Control has a dedicated team with over of 10 years of experience in pre construction termite barriers that will ensure you receive the best possible termite protection system for your new construction project.
Partial Termite Protection
Partial termite protection is an option offered as a cost effective way to meet government regulatory requirements.
This process is carried out prior to the slab being poured it usually involves pipe penetration protection to new homes and pipe penetration and cold joint protection to renovations and extensions.
(The process may vary depending on the construction method)
Total Termite Protection
Total termite protection is our preferred method, this process is usually carried out in two stages.
– Stage 1 prior to the slab being poured, protection of plumbing and service pipes.
– Stage 2 after the slab has been poured prior to cladding or brickwork, external perimeter protection. (the process may vary depending on the construction method)
Concrete Curing
Concrete curing is a process usually carried out as soon as possible after the concrete has been poured and finished to impede cracking. (The process may vary depending on the construction method)
Slab Edge Waterproofing
Slab edge waterproofing is usually carried after the slab has been poured to impede water ingress through the slab edge. (The process may vary depending on the construction method)